How Bluebeam Can Help the Public Sector with Design Review

In this second in a short series of articles we look at some examples of how Bluebeam helped public sector organisations make the review process more efficient, saving time and money and speeding up the delivery schedule.

This article was originally published in December 2023 and was updated in November 2026 with current features, verified customer results and Bluebeam Max.

Design review is the stage when an owner, architects and engineers check a building’s plans against its requirements and catch conflicts before construction starts. For public sector teams working with tight budgets and many stakeholders, doing that review digitally with Bluebeam Revu and Studio lets everyone mark up the same drawings at the same time, track every comment to closure and keep a record of who approved what. Bluebeam’s Construction Design Review: The Complete 2026 Guide covers the process in depth.

Technology and design in the public sector

Many public sector organizations in the U.K. and elsewhere are struggling to carry out their day-to-day work as resources come under pressure. There’s no reason the public sector can’t follow its private sector peers and use digital technology to deliver services more efficiently and economically.

This article looks at how Bluebeam helps local authorities and public building owners speed up one of the most important steps in any project: design review.

What is a design review?

A design review is a hugely important part of a public sector building project. It’s the point when the project’s stakeholders, including the owner, architect and engineers, look over the plan documents to make sure they match the building’s requirements.

“A big part of the design review process is making sure that there aren’t any conflicts that would affect the entire design of the building,” said Jeanette Popiel, an architect and former product manager at Bluebeam.

“So, there’s an internal coordination that happens throughout the design review process, making sure that things like mechanical duct is not too low for the ceiling height that was intended for the space.”

In recent years, digital transformation across the construction industry has made many common workflows easier and more efficient, and design review has benefited as much as any. Revu has made it routine to view and mark up PDF drawings, from annotating plans to measuring them. Studio in Revu goes further: Studio Projects store and manage documents, and Studio Sessions let a team review the same documents together in real time.

What are the benefits of design review software?

Public projects bring together owners, consultants, contractors and permitting staff who rarely sit in the same room. Review software gives all of them one shared set of drawings and one record of every decision, which is what keeps a review from stalling or being repeated.

By enabling collaboration in real time, Bluebeam speeds up design, constructability and quality assurance and quality control reviews. Every comment lands in the Markups list, where it can be sorted, assigned and tracked to closure.

Customers have reported big gains. Arup’s transport team says Revu and Studio brought standardization to its project delivery across offices and cut design review times by as much as 60% while maintaining quality. On the Merthyr Tydfil project below, contractor Morgan Sindall said quantity and estimating work was at least 80% faster, and Plumco, a Belgian heating and energy systems company, reports similar savings on quoting.

Digital measurement tools help teams capture a project’s true scope and cut errors and rework. And at the end of a project, teams can build punch lists (snag lists) directly from PDF drawings, so defects are logged, assigned and closed in one place.

How do public sector teams use Bluebeam for design review?

The clearest way to see the payoff is in projects that have already made the switch. These four public sector teams, from a Welsh bus station to a U.S. city permitting office, show how moving review onto shared digital drawings changes the timeline.

Merthyr Tydfil’s transport ambitions

Once called the U.K.’s “most disgraceful bus station,” the bus station in Merthyr Tydfil, Wales, was built in the 1960s and had become dilapidated and a focus of antisocial behavior. Merthyr Tydfil County Borough Council set out to replace it with a modern transport hub next to the railway station.

Bluebeam sped up communication between the council’s internal teams, builder Morgan Sindall and architect Capita, so tasks that would usually take a week took a day. Bluebeam was part of the standard toolkit for both companies, so the entire team, including many subcontractors, used it throughout the project.

Project partners marked up and collaborated on the same documents in real time or remotely, and every markup appeared in one list for easy tracking. The team saved its frequently used markups in the Tool Chest, and Capita used the Calibrate and measurement tools to set each PDF’s scale for accurate measurements. The finished bus interchange went on to win three national awards in 2021.

Bluebeam benefits a Montréal hospital

On the Centre Hospitalier de l’Université de Montréal (CHUM) hospital project in Canada, the architectural team from CannonDesign and NEUF architect(e)s faced a huge review workload. With more than 140 departments, design review meant three or more rounds of meetings with users from each one. At three to four hours a meeting, that added up to more than 1,200 hours of meetings for the rooms alone.

The team used Revu’s Calibrate tool to confirm measurements and check whether requested equipment would fit, which eliminated much of the usual back and forth. It reviewed drawings both in live meetings, with Revu projected on a screen, and in virtual meetings through Bluebeam Studio. The architects posted each package to a Studio Session and invited the other team members to join.

A custom tool set, a collection of drag-and-drop markup tools, assigned each reviewing firm a color, so the team could see who made each change, when they made it and who responded. CannonDesign’s Matt Forman estimated the approach saved about two to three weeks per review.

South Carolina’s efficiency gains

In 2014, the South Carolina Department of Transportation created a team to run its design-build projects, a delivery method in which the designer and contractor bid together and run design and construction at the same time. That speed depends on efficient design reviews, and SCDOT’s review process, in which stakeholders marked up drawings by hand and traded comments by email, wasn’t keeping up.

SCDOT turned to Bluebeam Studio Sessions so stakeholders could mark up and resolve comments on the same documents at the same time. Every comment was logged automatically with custom statuses, which strengthened the team’s record-keeping.

Reviews that took about 30 business days now take 15, and SCDOT credits the change with “millions in savings” across its projects.

Saving time and money for Seattle

In 2016, the Seattle Department of Construction and Inspections (SDCI) moved from paper to digital plan submissions. But the review itself was still clunky.

“Then our reviewers were just individually downloading the plan sets one at a time,” said Caelen Ball, then a new building plans examiner for the city. “And they would then take a text editor … and they would describe the problems in the drawings in the text editor.” The text file was then emailed to the applicant as a corrections letter and saved to the permit record.

That process kept the corrections in one document and the plans in another. Ball had used Bluebeam before and knew every comment could go directly on the plan as a markup.

After a department group saw what was possible at XCON, Bluebeam’s 2018 user conference in Austin, Texas, and a feasibility study followed, SDCI began its full Bluebeam implementation in early 2021. By mid-2022, the system was used for all new review submissions. In the first six months of 2022, Ball said, the department approved 20% more complex construction permits than in the previous six months.

What’s next: AI-assisted design review

Bluebeam Max adds AI and advanced features to Revu, including Smart Review, now in preview, which scans construction documents for design issues such as missing sheets, missing tags and gridline inconsistencies. Bluebeam notes Smart Review is currently optimized for U.S.-based vertical commercial construction, so public sector teams elsewhere should check whether it fits their projects.

Frequently asked questions

What is a design review in construction?

It’s the stage when the owner, architects and engineers check a project’s plans against its requirements and resolve conflicts, such as ductwork that sits too low for a ceiling, before construction starts.

How do public sector teams use Bluebeam for design review?

They mark up PDF drawings in Revu and review them together in Studio Sessions, so every stakeholder works on the same set and every comment is tracked to closure.

Do outside reviewers need a Bluebeam license?

No. People without an active Bluebeam plan can join a Studio Session with read-only access, and sessions support up to 500 users, according to Bluebeam’s Studio FAQs.

Where can I learn more about digital plan review?

Read Four Things Municipalities Should Do When Taking Plan Check Digital, or start a free trial of Bluebeam.